How to install an 5G click SPC floor?


Installing Stone Plastic Composite (SPC) flooring with a 5G click system offers a durable and straightforward flooring solution. The 5G click system simplifies the installation process through a fold-down mechanism, allowing planks to securely lock into place without adhesives. Here's a comprehensive guide to assist you:​ 


Preparation:

  1. Prepare the Subfloor:

  2. Gather Necessary Tools:


Installation Steps:

  1. Plan the Layout:

  2. Install the First Row:

  1. Install Subsequent Rows:

  • Begin the second row with a plank cut to at least 30 cm in length to stagger the joints, enhancing the floor's stability and appearance. ​Prodinex+1SAR Floors+1

  • Insert the long side of the plank at an angle into the previous row's groove, then lower it down.​

  • For the short end, use a rubber mallet and tapping block to gently tap and lock the joint securely.​SAR Floors

  • Repeat this process, ensuring a staggered pattern with at least a 20 cm offset between adjacent row joints.​

  1. Cutting Planks:

  • Measure and mark the plank where it needs to be cut.​

  • Score the surface with a utility knife along a straight edge, then snap the plank along the scored line.​Home Depot Images

  • Use the remaining piece to start the next row if it meets the minimum length requirement.​Prodinex

  1. Final Rows and Finishing:

  • For the last row, measure the width needed, accounting for the expansion gap, and cut the planks accordingly.​

  • Use a pull bar to ensure the final row is securely locked in place.​SAR Floors

  • Remove all spacers and install baseboards or moldings to cover the expansion gap, ensuring they are not fixed to the flooring to allow for movement.​

Post-Installation:

  • Maintain room temperature around 25°C to prevent expansion or contraction issues.​ 

  • Use felt pads under furniture legs to prevent scratches and place mats at entrances to reduce dirt and moisture on the floor.

How to install an 5G click SPC floor?


Installing Stone Plastic Composite (SPC) flooring with a 5G click system offers a durable and straightforward flooring solution. The 5G click system simplifies the installation process through a fold-down mechanism, allowing planks to securely lock into place without adhesives. Here's a comprehensive guide to assist you:​ 


Preparation:

  1. Prepare the Subfloor:

  2. Gather Necessary Tools:


Installation Steps:

  1. Plan the Layout:

  2. Install the First Row:

  1. Install Subsequent Rows:

  • Begin the second row with a plank cut to at least 30 cm in length to stagger the joints, enhancing the floor's stability and appearance. ​Prodinex+1SAR Floors+1

  • Insert the long side of the plank at an angle into the previous row's groove, then lower it down.​

  • For the short end, use a rubber mallet and tapping block to gently tap and lock the joint securely.​SAR Floors

  • Repeat this process, ensuring a staggered pattern with at least a 20 cm offset between adjacent row joints.​

  1. Cutting Planks:

  • Measure and mark the plank where it needs to be cut.​

  • Score the surface with a utility knife along a straight edge, then snap the plank along the scored line.​Home Depot Images

  • Use the remaining piece to start the next row if it meets the minimum length requirement.​Prodinex

  1. Final Rows and Finishing:

  • For the last row, measure the width needed, accounting for the expansion gap, and cut the planks accordingly.​

  • Use a pull bar to ensure the final row is securely locked in place.​SAR Floors

  • Remove all spacers and install baseboards or moldings to cover the expansion gap, ensuring they are not fixed to the flooring to allow for movement.​

Post-Installation:

  • Maintain room temperature around 25°C to prevent expansion or contraction issues.​ 

  • Use felt pads under furniture legs to prevent scratches and place mats at entrances to reduce dirt and moisture on the floor.

How to install an 5G click SPC floor?


Installing Stone Plastic Composite (SPC) flooring with a 5G click system offers a durable and straightforward flooring solution. The 5G click system simplifies the installation process through a fold-down mechanism, allowing planks to securely lock into place without adhesives. Here's a comprehensive guide to assist you:​ 


Preparation:

  1. Prepare the Subfloor:

  2. Gather Necessary Tools:


Installation Steps:

  1. Plan the Layout:

  2. Install the First Row:

  1. Install Subsequent Rows:

  • Begin the second row with a plank cut to at least 30 cm in length to stagger the joints, enhancing the floor's stability and appearance. ​Prodinex+1SAR Floors+1

  • Insert the long side of the plank at an angle into the previous row's groove, then lower it down.​

  • For the short end, use a rubber mallet and tapping block to gently tap and lock the joint securely.​SAR Floors

  • Repeat this process, ensuring a staggered pattern with at least a 20 cm offset between adjacent row joints.​

  1. Cutting Planks:

  • Measure and mark the plank where it needs to be cut.​

  • Score the surface with a utility knife along a straight edge, then snap the plank along the scored line.​Home Depot Images

  • Use the remaining piece to start the next row if it meets the minimum length requirement.​Prodinex

  1. Final Rows and Finishing:

  • For the last row, measure the width needed, accounting for the expansion gap, and cut the planks accordingly.​

  • Use a pull bar to ensure the final row is securely locked in place.​SAR Floors

  • Remove all spacers and install baseboards or moldings to cover the expansion gap, ensuring they are not fixed to the flooring to allow for movement.​

Post-Installation:

  • Maintain room temperature around 25°C to prevent expansion or contraction issues.​ 

  • Use felt pads under furniture legs to prevent scratches and place mats at entrances to reduce dirt and moisture on the floor.

Deeco Floors Co., Ltd. (Head Office) 138/62 M.12 Chaiyaphruek Road, Nongprue, Banglamung, Chonburi 20150, Thailand

hello@deecofloors.co.th

Deeco Floors Co., Ltd. (Head Office) 138/62 M.12 Chaiyaphruek Road, Nongprue, Banglamung, Chonburi 20150, Thailand

hello@deecofloors.co.th

Deeco Floors Co., Ltd. (Head Office) 138/62 M.12 Chaiyaphruek Road, Nongprue, Banglamung, Chonburi 20150, Thailand

hello@deecofloors.co.th

Deeco Floors Co., Ltd. (Head Office) 138/62 M.12 Chaiyaphruek Road, Nongprue, Banglamung, Chonburi 20150, Thailand

hello@deecofloors.co.th